Inspired by a helpful YouTube guide. This walk-through draws on the practical video "How to re-roof a shed with Onduline corrugated roofing sheets", which demonstrates the fixings, overlaps, and ridge cap installation clearly. Onduline bitumen sheets are widely available in UK builders' merchants and a popular choice for shed re-roofing.
1. Strip off the old roofing
Prise up the old felt or sheets, working from the ridge downwards. Use a bolster chisel and mallet to free any fixings. Stack the waste carefully - old bitumen felt is heavy and awkward, and double-bagging saves a lot of mess.
Clear any loose nails and staples from the deck boards as you go. A magnetic nail sweeper on a broom handle speeds this up considerably.
2. Check the decking boards underneath
Once the roof is bare, check every board for rot and movement. Push a screwdriver firmly into soft-looking timber - if it sinks in, the board needs replacing before you go any further. Loose boards should be re-fixed with galvanised ring shank nails or screws. This is the step most people skip and later regret.
3. Measure up and order the sheets
Measure the roof from eave to ridge, and from one gable to the other. Add an overhang of around 50mm at the eaves. Order sheets with enough to allow at least one full corrugation width overlap at side laps, and at least 150mm at end laps where sheets meet along the pitch.
Most corrugated sheets come in standard UK lengths of 2m and 3m. Bitumen sheets (such as Onduline), fibre cement, and steel corrugated sheet are all available from builders' merchants.
4. Start at the lowest point
Lay the first sheet at the bottom corner of the roof, with the lower edge overhanging the eave by 50mm. Hold it in place temporarily before you make a single fixing - corrugated sheets are unforgiving once you've made a hole. Check the bottom edge is parallel to the eave.
5. Fix the first sheet correctly
Drive fixing screws or nails through the crowns of the corrugations (the high points), not down into the valleys. For bitumen sheets, use the nails or screws supplied with the product. For steel or fibre cement, use self-drilling screws with a neoprene washer to keep the fixing watertight. Fix at every purlin or board support along the length.
6. Work up the roof and across each course
Overlap each sheet by one full corrugation on the side laps and by at least 150mm at end laps. Work from one gable to the other, then continue up to the ridge. Keep checking your lines as you go - a small misalignment at the bottom becomes a noticeable one by the top.
7. Fit the ridge cap and seal any exposed edges
Most corrugated sheet suppliers sell a matching ridge piece. Fit it over the apex with the same side-lap overlap and secure it with appropriate fixings. Where sheets finish at the gable ends, fold or cut the last sheet to form a simple drip edge, or fit a barge cap if the product includes one. Seal around any fixings with roofing sealant if the manufacturer recommends it.
When to call a handyman
Call Richard if the deck boards are rotten and need replacing, if the shed is at an awkward height, or if the structure itself needs checking over at the same time. Re-roofing a standard garden shed is a one-day job for two people, but the board replacement that often follows the strip-off can add half a day.