5% off for pensioners on every job

Floor tiling guide

How to lay floor tiles

Floor tiles done well last decades. Done badly, they crack at the grout, curl at the edges, and start to hollow out underfoot within a few years. The difference nearly always comes down to what happens before the first tile goes down, not the tiling itself.

Inspired by a helpful YouTube guide. This walk-through draws on the popular tutorial "Tiling a Small Bathroom Floor in 2 Hours", which walks through a complete small bathroom floor from bare boards to finished grout. Worth watching before you buy anything - the section on setting out from the centre makes a big difference to how the finished floor looks.

1. Check whether the subfloor is solid enough

Tiles crack when the floor below them flexes. Walk around the room and feel for any bounce or give underfoot. Timber floors in older UK houses often need a layer of tile backer board (also called Hardiebacker or Wedi board) screwed down at close centres before you tile, to stiffen the whole thing up.

Concrete floors usually just need checking for cracks and high spots. Any crack wider than 2mm should be filled with a flexible floor repair compound - rigid filler will telegraph straight through. Grind down any high spots with an angle grinder.

2. Level the floor if needed

Tiles need a flat surface, not necessarily a perfectly level one. Hold a long spirit level or straight edge across the floor in several directions. Any dip deeper than 3mm across a 2m span will cause problems, and high spots of more than 3mm will mean tiles rocking and cracking under foot traffic.

Self-levelling compound handles dips well. Mix it to the right consistency, pour from one corner, and work quickly to spread it. Leave it to cure fully before you tile, which on most UK products means 24 hours minimum. It is worth buying the primer too - it helps the compound bond to dusty concrete or old adhesive.

3. Set out from the centre of the room

Find the centre of the room by snapping chalk lines between the midpoints of opposite walls. Where they cross is your starting point. Dry-lay a row of tiles out from the centre in both directions to see how the cuts will fall at the walls.

You want reasonably sized cuts all round, ideally more than half a tile. If the layout leaves a narrow strip of less than 50mm at one wall, shift the starting point by half a tile width. That ten minutes of planning saves a lot of awkward cutting later.

4. Mix and apply the tile adhesive

Use a flexible floor tile adhesive rated for the substrate you are tiling onto. Standard wall tile adhesive is not strong enough for floors. For bathroom floors in older UK houses where there may be some flex, use a fully flexible S2-rated adhesive.

Spread the adhesive with a notched trowel - the notch size depends on the tile size, but 6mm notches suit most standard bathroom tiles. Comb in one direction and press each tile down with a slight twist. Check frequently with a spirit level across three or four tiles in both directions.

5. Lay the full tiles first, then cut the edges

Lay all the whole tiles across the floor working from the centre lines outward. Use tile spacers to keep the grout joints consistent - 2mm or 3mm for most bathroom floor tiles. Keep checking your level as you go, especially at the transitions between sections.

Leave the border cuts until all the whole tiles are in and the adhesive has had a chance to firm up a little (about an hour in normal UK indoor temperatures). This means you can still work without kneeling on fresh adhesive and shifting your tiles.

6. Measure and cut the border tiles

Measure each border cut individually - walls are rarely perfectly straight and dimensions change across the length of a room. A cheap manual tile cutter handles straight cuts on most standard ceramic tiles. For porcelain or anything larger than 600mm, a wet tile saw gives much cleaner results with less risk of the tile breaking halfway through the cut.

L-shaped cuts around toilet bases and pipe penetrations are best done with an angle grinder and a diamond blade. Score the cut line first with a tile scribe or angle grinder, then snap or grind to shape. Take it slowly near the corners of the L.

7. Grout and finish

Wait at least 24 hours after the last tile goes down before you grout. Remove all spacers first. For floor tiles, use a floor-grade grout - wall grout is softer and wears down. Where tiles meet a bath, shower tray, or wall, use silicone sealant rather than grout: it flexes with movement rather than cracking.

Push the grout into the joints with a rubber grout float, working diagonally across the tile faces. Wipe off the excess with a damp sponge before it sets hard. Once the grout has dried fully (usually 24 hours), apply a grout sealer to protect it, especially in a bathroom.

When to call a handyman

Call Richard if the existing floor is in poor condition, there are cracked joists, the subfloor needs backer board across a large area, or you want underfloor heating set into the adhesive layer. Tiling a room with complex cuts around a wet room area or over underfloor heating coils is straightforward for someone who has done it before, but fiddly enough that most people are glad to hand it off.

Need floor tiles laid?

The Sandwich Handyman can prepare subfloors, lay floor tiles, and grout and seal to a clean finish in bathrooms and kitchens across Sandwich and East Kent.

Contact Richard