Inspired by a helpful YouTube guide. We based this guide on a helpful YouTube walkthrough showing the full process of building a brick raised planter from foundations through to filling and planting. Good practical detail on the mortar mix and drainage gaps - the kind of things that make the difference between a planter that lasts and one that cracks open in a few winters.
1. Plan the size and position
Keep the planter to a width you can comfortably reach across from both sides - around 600-900mm is ideal for most people. Any wider and you will end up kneeling on the soil to reach the middle, which defeats the point of raised planting.
Height depends on what you are growing. For general flowers and shrubs, three to five courses of brick (around 225-375mm) is plenty. For vegetables where you want to avoid bending entirely, go higher - six to eight courses with a capping brick on top.
Mark out the footprint with canes and string before you start. Lay a dry course of bricks around the perimeter to check the dimensions work and that you are not going to have awkward cuts everywhere. Adjust the layout to work with full or half bricks wherever possible.
2. Mark out and prepare the foundation
A brick planter does not need deep foundations like a structural wall, but it does need a solid, level base. Dig out the topsoil to about 150mm depth and compact the base with a heavy rammer or the end of a fence post.
Add a 100mm layer of compacted hardcore or crushed concrete. Check it is level across the whole footprint with a spirit level. If this base is not flat, the walls will not be straight and the mortar joints will vary all over the place.
You can pour a thin concrete blinding layer over the hardcore if you prefer - about 50mm of a dry 1:3 (cement:sand) mix, levelled off and left to cure overnight before you start laying bricks. It gives a very clean base to work from.
3. Choose the right bricks and mix your mortar
Use engineering bricks or a good quality facing brick that is rated for external use and frost resistance. Standard commons from a builders' merchant are fine for the lower courses. Avoid reclaimed bricks unless you know they are frost-resistant - old soft bricks spall badly in wet winters.
Mix mortar at 1 part cement to 5 parts building sand. It should hold its shape when squeezed in your hand but not be stiff. Too dry and it will crumble; too wet and the bricks will slide around. Add plasticiser to make it more workable - a small squirt in a standard bucket mix is enough.
Mix small batches at a time, especially in hot weather. Mortar goes off faster than you think, and once it starts to stiffen up it is not worth trying to re-use.
4. Lay the first course carefully
The first course sets the standard for everything above it. Spread a full bed of mortar about 10mm thick across the foundation, then set the corner bricks first and string a line between them at the face of the wall.
Lay bricks along the line, buttering the end of each one before pressing it into the bed. Tap each brick level with the handle of your trowel - check along the string line and across the width with a spirit level as you go. The first course needs to be absolutely level before you move on.
Keep mortar joints consistent at around 10mm. Scrape off any excess that squeezes out before it hardens - clean joints look much better than rough ones.
5. Build up the courses with consistent joints
Stagger the vertical joints as you build up. Each brick should sit over the joint below it - this is stretcher bond, the standard pattern for a single-skin wall. If the vertical joints line up course after course, the wall will be weak.
Keep checking plumb as you go. Hold a spirit level against the face of the wall every two or three courses. A wall that leans outward at the top will push over eventually under the pressure of wet soil. A builder's line clipped to corner pins keeps the face consistent on longer runs.
Work in manageable lifts - do not try to build the full height in one go. Three or four courses at a time is sensible. Let earlier courses stiffen slightly before adding more weight above them.
6. Leave drainage gaps in the lower course
This is the step most people miss. Without drainage gaps, water cannot escape and the soil inside gets waterlogged. Roots rot. Plants die. The mortar joints at the base of the wall can also crack from freeze-thaw pressure if water sits against them.
Leave weep holes by omitting the mortar from every third or fourth cross joint in the first course above ground level. These small gaps let water drain freely and make a big difference to how the planter performs through a wet UK winter.
Alternatively, drill a few 20mm drainage holes through the mortar joints with a masonry bit after the wall has cured. Either way, do not skip this step.
7. Allow to cure before filling with soil
Leave the finished planter for at least 48 hours before adding any soil or compost. In cold weather, give it longer - mortar cures slowly below 10 degrees C, and loading it up too soon can shift the lower courses before they have set properly.
Once cured, line the inside with a permeable landscape fabric before filling. It stops fine soil washing out through the drainage gaps while still letting water through. Add a layer of coarse gravel at the base, then fill with a mix of topsoil and compost to within about 50mm of the top.
Point the exposed mortar joints with a slightly drier mortar mix and a pointing trowel to give a neat finish. Brush off any smears while still fresh - dried mortar on brick faces is hard work to remove cleanly.
When to call a handyman
Call Richard if the foundation prep is more involved than expected, if you want the brickwork to be particularly neat, or if you are building against an existing wall and need to tie in properly. Brickwork is satisfying to do yourself but takes a bit of practice to get really tidy.
Garden brickwork and planters
The Sandwich Handyman can build raised planters, garden walls, and brick borders for homes in Sandwich and across East Kent.
Contact Richard